Time to unload the stones at the fire station. A bed of mortar was spread on the concrete pad. The base stone is lowered, and muscled into place. A little persuasion from the backhoe levels the stone. The skies darken as a sudden storm rolls in. Click here for storm pictures. Waiting out the storm. The storm is gone, so work resumes. The headstone is muscled into place. The head stone is set! The head stone is leveled and mortar is added to fill in the gaps. The finished stone.
Click here to return to our home page.
|